News

Survey of the Lyndon sewer system at Sugarloaf Lake

Stantech & MLW&SA will be conducting a survey of the Lyndon sewer system at Sugarloaf Lake starting next week for about 2 weeks.  The work is being done as part of a grant from MDEQ.  It is basically an assessment and documentation of the sewer plant and house connections.  The data will then be used to properly plan for the future.

The staff will have identification and be in a Stantech Engineering and/or Multi Lakes Water & Sewer Authority truck.  No one needs to go in the house.  

© 2017 Lyndon Township, MI 17751 N. Territorial Road, Chelsea, MI 48118

Powered By Revize Login